Voyageur 3D Seismic Program Photos
01/30/2009
Here are some photo's from the 3D Seismic Acquisition Program.

Drilling Rig for Uphole Shots

Receiver Cables


Vibroseis Trucks


Lunch





Voyageur Team travels to BEKS Block
10/20/2007
In September 2007, the Voyageur Team of Darren Stevenson, Matthew Stevenson, Duncan McMaster and Mongi Haffouz traveled to the BEKS Permit in Southern Tunisia.
The trip took 4 days and involved a flight from Tunis to Djerba and then a 12 hour drive along primitive roads to reach the southernmost portion of Tunisia.
Here is some photos from the trip.

Duncan McMaster Exploring the Sand Dunes on the Western Portion of the Block

Voyageur Team at the BEKS Block (L-R) Mongi Haffouz, Darren Stevenson, Duncan McMaster, Matthew Stevenson

Darren Stevenson and Duncan McMaster enroute to BEKS Block, Southern Tunisia

Duncan McMaster and Mongi Haffouz, en route to BEKS

Duncan McMaster Exploring the Rocky Eastern Portion of the BEKS Block

Inamenas Pipeline Pumping Station, the pipeline runs through the BEKS Block

Inamenas Pipeline Pumping Station

Lone palm tree on the sand dominated western portion of the BEKS Block

Western Portion of the BEKS Block
View Archives